Hello There!

Lorem ipsum dolor sit amet, consectetur
adipiscing elit,

Information

Follow Us

Well – Completion

Well Completion is the process of making a well ready for production (or injection) after drilling operations. This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated down hole tools as well as perforating and stimulating as required. Sometimes, the process of running in and cementing the casing is also included. After a well has been drilled, should the drilling fluids be removed, the well would eventually close in upon itself. Casing ensures that this will not happen while also protecting the wellstream from outside incumbents, like water or sand.

RigTech was established to provide training for candidates in HSE and the Oil & Gas sector. It is ISO 9001:2015 certified by DNV and accredited by IADC (Associate Member) and IOSH (UK).

Got Questions? Call us

Our Newsletter

Enter your email and we’ll send you more information